Mosaic Sculpture, Alameda, CA
Jean Sweeney Open Space Park
Commissioned in 2018, the completion is scheduled for Spring 2021. Two 16 foot columns of cast concrete are covered in glass mosaic.
The capitals are heavier (about 460lbs) than the side panels (which are 180lbs to 250lbs depending on the design) so I use a gantry crane to move them around.
November 2020:
Beginning work on the capitals of the columns.
October 2020:
Finished applying mosaic to all 20 vertical panels, that rise up fifteen feet in two columns. Each panel has emerged with its own personality. I have my favorites, but it seems to change.
September 2020:
Completion of mosaic on all five panels on the first sides of both column A and Column B means work on second sides is ready to start. This will be complicated by the need to align mosaic work side to side as well as top and bottom. Special attention needs to be given to the drawings during this phase of the project.
August 2020:
Laying out mosaic on first side of Column B. Finding it difficult to manage the dust in the studio, have to mop the floors every three or four days. It’s not enough to sweep up at the end of each session. It doesn’t help that the sky has turned black with wildfire smoke, looks like the end of the world. I am experimenting with different types of respirators. The N95 has gone missing with Covid19. I ‘m now using a vapor mask, which keeps my glasses from fogging up but is hot to wear.
July 2020:
Completed applying mosaics to first side of column A. Working six to eight hours a day during the week and just a couple on the weekends. Went backpacking in the Tahoe National Forest for a couple of days but otherwise in the studio every day.